Kautex实习报告英语版(与YHC合作完成)
Report for Exercitation in Kautex
I participated the exercitation project in Kautex Cancun Plant (a joint venture between Kautex Textron and a local corporation, producing plastic fuel tanks for FAW-Volkswagen, FAW-Mazda and Shanghai GM) from July 10th to August 2nd. I took part in the work of several departments of the plant and the achievements are as follows.
1.0 Technical Department
1.1 visit the assembly lines
1.2 analyze the structure of PQ35 as an example of the products
1.3 analyze each process of the production
1.4 audit the technical discussing of the engineers
2.0 Management Department
2.1 training of 6-Sigma with DMIAC
2.2 training of 7-Waste / Muda
2.3 understand the idea
2.4 audit the daily conference of the company executives
3.0 Project Department
3.1 study of process diagram of Kautex project system
3.2 project management case study
4.0 Quality Control department
4.1 watch the operation of CAQ system on the assembly line
4.2 analyze the internal problems of system failure
4.3 study some criteria of automobile industry
4.3.1 TS 16949 / ISO 14001
4.3.2 QS 9000 / VDA6.1 / OHSAS 18001
4.4 experiments
4.4.1 observation of section slices of the fuel tanks
4.4.2 measuring the actual size of a fuel tank (PQ-35) in a three dimensional frame
5.0 Others
5.1 visit assembly line of FAW-Volkswagen Plant
This exercitation offers me practical experience and new knowledge of modern way of production and management. It is of great use in the further study and orientation of my major in the university.
Chen Shen
Summer XX
Position:
Recruiting manager of the testing department
Duty:
This August I found a new job which is a recruiting manager of a famous software company. Because of the operation of our company is providing world-class IT solutions to global clients. So every position requires good English communication skills including mine. In this job I lead a hiring team and be responsible for supporting staffer needs of the testing department. The latter half of the year is the busiest period, because many new projects have been processing. Almost all the project teams are short of hands. Software outsourcing is an agreement that provides deadlines for completion of the work. If we could not find employable engineers in time, the vender must change the order to other competitory company.
In order to drive for quality hire with short cycle time. I communicate with testing projects leaders to know every projcet’s distinctive characteristic, technical details, position salary and tensity of the task. Then list a rate of progress, arrange recruiters in charge of different project according this plan. For expedite the recruiting progress, I also take on the role with responsibility for ADOBE and EMC (clients’ company). Define the job and recruiting action plan. Choosing resumes, interviewing with candidates and commending qualified candidates to attend client’s final test are my daily grind, to most effectively coordinate with staffing processes. If the candidates pass the final test, we will announce correlative dept to transact procedure. Implement testing department staffing processes to ensure compliance. Up to last month our recruiter team has hired seventy eight qualified staffers including I found the nineteen engineers.
Kautex实习报告英语版(与YHC合作完成)
Report for Exercitation in Kautex
I participated the exercitation project in Kautex Cancun Plant (a joint venture between Kautex Textron and a local corporation, producing plastic fuel tanks for FAW-Volkswagen, FAW-Mazda and Shanghai GM) from July 10th to August 2nd。 I took part in the work of several departments of the plant and the achievements are as follows。
1。0 Technical Department
1。1 visit the assembly lines
1。2 analyze the structure of PQ35 as an example of the products
1。3 analyze each process of the production
1。4 audit the technical discussing of the engineers
2。0 Management Department
2。1 training of 6-Sigma with DMIAC
2。2 training of 7-Waste / Muda
2。3 understand the idea
2。4 audit the daily conference of the company executives
3。0 Project Department
3。1 study of process diagram of Kautex project system
3。2 project management case study
4。0 Quality Control department
4。1 watch the operation of CAQ system on the assembly line
4。2 analyze the internal problems of system failure
4。3 study some criteria of automobile industry
4。3。1 TS 16949 / ISO 14001
4。3。2 QS 9000 / VDA6。1 / OHSAS 18001
4。4 experiments
4。4。1 observation of section slices of the fuel tanks
4。4。2 measuring the actual size of a fuel tank (PQ-35) in a three dimensional frame
5。0 Others
5。1 visit assembly line of FAW-Volkswagen Plant
This exercitation offers me practical experience and new knowledge of modern way of production and management。 It is of great use in the further study and orientation of my major in the university。
Chen Shen
Summer XX
河南高考排名195560左右排位理科可以上哪些大学,具体能上什么大学
吉林外国语大学和湘潭大学兴湘学院哪个好 附对比和区别排名
江西工商职业技术学院在黑龙江高考历年录戎数线(2024届参考)
甘肃高考排名5480左右排位理科可以上哪些大学,具体能上什么大学
四川文化艺术学院和天津城建大学哪个好 附对比和区别排名
江西高考排名71510左右排位理科可以上哪些大学,具体能上什么大学
酒店传菜员实习报告4000字
技术部员工述职报告
精选教师述职报告集锦8篇
护士个人竞聘工作的述职报告(通用六篇)
酒店传菜员实习报告4000字
办公室助理的实习报告
销售类实习报告
自动化生产实习报告合集10篇
有关物流大学生实习报告四篇
酒类实习报告范文锦集九篇
齐齐哈尔工程学院在新疆高考招生计划人数专业代码(2024参考)
宁夏工商职业技术学院在河南高考招生计划人数专业代码(2024参考)
河北高考排名184970左右排位历史可以上哪些大学,具体能上什么大学
湖北高考排名174600左右排位物理可以上哪些大学,具体能上什么大学
考福州外语外贸学院要多少分宁夏考生 附2024录取名次和最低分
湖南师范大学在云南高考招生计划人数专业代码(2024参考)
广东高考排名247430左右排位物理可以上哪些大学,具体能上什么大学
陕西青年职业学院在宁夏高考历年录戎数线(2024届参考)
安徽文达信息工程学院的审计学专业排名怎么样 附历年录戎数线
安徽高考排名263910左右排位理科可以上哪些大学,具体能上什么大学
考安顺学院要多少分广东考生 附2024录取名次和最低分
广东高考排名94120左右排位物理可以上哪些大学,具体能上什么大学
四川高考排名6710左右排位理科可以上哪些大学,具体能上什么大学
考洛阳科技职业学院要多少分甘肃考生 附2024录取名次和最低分
福建高考排名46830左右排位物理可以上哪些大学,具体能上什么大学
重庆机电职业技术大学的数控技术专业排名怎么样 附历年录戎数线
郑州升达经贸管理学院和辽宁工业大学哪个好 附对比和区别排名
赣州职业技术学院和扬州工业职业技术学院哪个好 附对比和区别排名
江西外语外贸职业学院在内蒙古高考历年录戎数线(2024届参考)
四川高考排名14260左右排位理科可以上哪些大学,具体能上什么大学
高校生施工实习报告
电脑维修实习报告范文
关于大学生银行实习报告三篇
教师实习报告范文(通用三篇)
关于水利工程的实习报告三篇
学前实习报告范文八篇
在学校实习报告范文集合8篇
品质实习报告三篇
销售公司实习报告合集八篇
给水实习报告七篇
英语专业旅行社实习报告
关于教师实习报告四篇
会计的毕业实习报告三篇
会计电算化专业毕业实习报告范例
精选大学生邮政储汇局毕业实习报告